MAANG - JFHQ - Phase One 
 

DSC_02471.JPG

Monahan Technologies has been contracted to provide the HVAC for the New Massachusetts Air National Guard Joint Force Headquarters at Hanscom AFB, in Bedford MA.  This is a ground up LEED certified construction project.  Construction has started and anticipated completion date is December of 2011.    
April 2011
 

VAMC Endoscopy Unit Renovations, Jamaica Plain, MA  

Animated Backhoe

Monahan Technologies has recently been awarded the HVAC for the Endoscopy Renovations at the VAMC Jamaica Plain.  The project consists of the complete demolition and rehabilitation of existing Endoscopy wing, including new HVAC equipment, pipe and duct systems and a complete controls upgrade.  BC Construction of North Reading is General Contractor         
May 2011

Nashua City Hall - Nashua NH 
htcupload79.jpg
Monahan Technologies has recently completed the HVAC and Roofing upgrades at the Nashua City Hall.  The project provided for the installation of new HVAC equipment through out the builidng, including but not limited to packaged York roof tops, Mitsubishi Citi Multi Heat Pumps and a complete building controls upgrade provided by Johnson Controls of Manchester.  This was a very technical project requiring coordination with the General Contractor and Client for all work in this fully operational building.  
March 2011

Levedo Building - 241 Talbot Street, Dorchester MA 
DSC_0003A.JPG
Monahan Technologies, has recently completed this multi tenant LEED Certified building in Dorchester MA.  James J Welch is General Contractor
May 2011
     

University of Mass - Lowell
IMAG0450.jpg
Generator Stack Replacements

September
University of Massachusetts - Generator Stack Replacements
Monahan Technologies was recently contracted to provide generator stack replacements for University of Massachusetts at Lowell.  
The project consisted of the installation of (5) new black iron stacks welded and routed as specified to new locations above the roof line.  Monahan Acted as prime contractor on this DCAM project.